
University focused on engineering innovation and smart energy research upgrades to new Modumax mk4 boilers
Read MoreStainless steel high efficiency, fully modulating condensing pre-mix floor standing boiler.
Available in 5 modules with outputs (@80/60°C) of 97, 116, 147, 196 and 254kW. Individual boiler modules can be stacked one, two or three high in 15 combinations up to 762kW output.
Fully modulating boiler which benefits from lower fuel usage and closer load matching.
Space-saving stacked modular boiler delivering 762kW in less than a square metre footprint.
Flexibility in system design with differential temperature (delta T) up to 40°C. Suited to district heating schemes, the lower flow rates associated with wider differential temperature allow smaller diameter pipes and smaller pumps that can lower capital cost and also reduce energy consumption.
Compensate for distribution losses in large heating systems with max 90°C flow temperature.
10 bar maximum working pressure allows installation in basement for high rise buildings.
Stainless steel heat exchanger backed up by a 10-year warranty.
High relative velocity within the waterways help to reduce the opportunity for sedimentation.
Low water content, rapid response, with minimal standing losses.
Built in boiler sequence controls capable of controlling up to 16 boiler modules and hot water circuits.
Low environmental impact - NOx <40mg/kWh for maximum BREEAM credits.
Lightweight, fits through a standard doorway and can split into modules making Modumax mk4 ideal for limited access or rooftop plant rooms, as well as packaged plant rooms.
Buy in confidence from a UK manufacturer with decades of commercial heating and hot water expertise.
Back up and support from our team of experienced engineers across the UK.
Extensive boiler spare parts service available direct from the manufacturer.
BIM objects available to assist in design and management.
Hybrid systems alongside combined heat and power (CHP) and/or other low carbon technologies such as our commercial monobloc air source heat pumps.
Energy centres within district heating schemes and larger premises.
Housing developments and flats using district heating network.
Easy fit replacement for refurbishment projects.
Roof top and basement plantrooms.
Packaged plantrooms.
New build projects.
Large commercial and public buildings including schools, hospitals and hotels.
Medium sized commercial and public buildings including schools, hospitals, offices and hotels.
Small industrial and manufacturing premises.
Locations with substantial and continuous heating load including hospitals, care homes and hotels.
Pipework kits with optional pumps to match the boiler model for ease of installation on site.
Flues available
Choose from a wide range of service contracts to help maintain optimum performance.
Book commissioning at the same time as placing your order for improved warranty terms.
Single Boiler Controls
Modbus gateway kit.
Outside air temperature sensor QAC34.
Domestic Hot Water sensor kit (sensor and pocket).
Mixing valve heating circuit control kit (clip in control module, temperature sensor and pocket) for 1 zone.
Programmable room sensor QAA75.
Offset adjustable room sensor QAA55.
Multiple Boiler Controls
Modbus gateway kit.
Outside air temperature sensor QAC34.
Volt free contact kit for remote status signalling AGU2.550A109.
Heating circuit sensor kit (sensor and pocket) QAZ36.
LPB Bus communication module OCI345, one required per boiler module.
Programmable room sensor QAA75.
Units | 97/97H | 97/194V | 97/291V | 116/116H | 116/232V | 116/348V | 147/147H | 147/294V | 147/441V | 196/196H | 196/392V | 196/588V | 254/254H | 254/508V | 254/762V | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
No. of modules | 1 | 2 | 3 | 1 | 2 | 3 | 1 | 2 | 3 | 1 | 2 | 3 | 1 | 2 | 3 |
Units | 97/97H | 97/194V | 97/291V | 116/116H | 116/232V | 116/348V | 147/147H | 147/294V | 147/441V | 196/196H | 196/392V | 196/588V | 254/254H | 254/508V | 254/762V | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Building regulations Part L seasonal efficiency | % gross | 94.9 | 94.9 | 94.9 | 93.1 | 93.1 | 93.1 | 94.8 | 94.8 | 94.8 | 93.9 | 93.9 | 93.9 | 95.0 | 95.0 | 95.0 |
BS EN 15502 seasonal efficiency | % gross | 95.2 | 95.2 | 95.2 | 93.4 | 93.4 | 93.4 | 95.2 | 95.2 | 95.2 | 94.1 | 94.1 | 94.1 | 95.3 | 95.3 | 95.3 |
Boiler output 80/60°C, NG & LPG | kW | 95.7 | 191.4 | 287.1 | 115.2 | 230.4 | 345.6 | 142.8 | 285.6 | 428.4 | 191.6 | 383.2 | 574.8 | 239.8 | 479.6 | 719.4 |
Boiler output 50/30°C, NG & LPG | kW | 97.2 | 194.4 | 291.6 | 116.2 | 232.5 | 348.7 | 147.4 | 294.8 | 442.2 | 196.3 | 392.6 | 588.9 | 254.4 | 508.7 | 763.1 |
Boiler input (gross) - maximum, NG | kW | 109 | 218 | 327 | 133 | 266 | 399 | 163 | 326 | 489 | 219 | 428.7 | 657 | 275 | 550 | 825 |
Boiler input (gross) - maximum, LPG | kW | 106.7 | 213.4 | 320.1 | 130.2 | 260.4 | 390.5 | 159.5 | 319.1 | 478.6 | 214.4 | 428.7 | 643.1 | 269.2 | 538.3 | 807.5 |
Boiler input (net) - maximum, NG & LPG | kW | 98.2 | 196.4 | 294.6 | 119.8 | 239.6 | 359.4 | 146.8 | 293.6 | 440.3 | 197.2 | 394.4 | 591.6 | 247.6 | 495.3 | 742.9 |
Boiler output - minimum 80/60°C, NG & LPG | kW | 19.1 | 19.1 | 19.1 | 23.5 | 23.5 | 23.5 | 28.7 | 28.7 | 28.7 | 38.6 | 38.6 | 38.6 | 48.4 | 48.4 | 48.4 |
Units | 97/97H | 97/194V | 97/291V | 116/116H | 116/232V | 116/348V | 147/147H | 147/294V | 147/441V | 196/196H | 196/392V | 196/588V | 254/254H | 254/508V | 254/762V | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Water content | litres | 16 | 32 | 48 | 16 | 32 | 48 | 22 | 44 | 66 | 22 | 44 | 66 | 22 | 44 | 66 |
System design flow rate @ 40°C ∆T rise | l/s | 0.6 | 1.2 | 1.8 | 0.7 | 1.4 | 2.1 | 0.9 | 1.8 | 2.7 | 1.2 | 2.4 | 3.6 | 1.5 | 3 | 4.5 |
Water side pressure loss @ 40°C ∆T rise | mbar | 5 | 5 | 5 | 7 | 7 | 7 | 36 | 36 | 36 | 62 | 62 | 62 | 100 | 100 | 100 |
System design flow rate @ 30°C ∆T rise | l/s | 0.8 | 1.6 | 2.4 | 1 | 2 | 3 | 1.2 | 2.4 | 3.6 | 1.6 | 3.2 | 4.8 | 2 | 4 | 6 |
Water side pressure loss @ 30°C ∆T rise | mbar | 9 | 9 | 9 | 14 | 14 | 14 | 60 | 60 | 60 | 120 | 120 | 120 | 180 | 180 | 180 |
System design flow rate @ 20°C ∆T rise | l/s | 1.2 | 2.4 | 3.6 | 1.4 | 2.8 | 4.2 | 1.8 | 3.6 | 5.4 | 2.4 | 4.8 | 7.2 | 3 | 6 | 9 |
Water side pressure loss @ 20°C ∆T rise | mbar | 20 | 20 | 20 | 27 | 27 | 27 | 145 | 145 | 145 | 246 | 246 | 246 | 395 | 395 | 395 |
System design flow rate @ 11°C ∆T rise | l/s | 2.2 | 4.4 | 6.6 | 2.6 | 5.2 | 7.8 | 3.3 | 6.6 | 9.9 | 4.3 | 8.6 | 12.9 | 5.4 | 10.8 | 16.2 |
Water side pressure loss @ 11°C ∆T rise | mbar | 61 | 61 | 61 | 91 | 91 | 91 | 500 | 500 | 500 | 850 | 850 | 850 | 1300 | 1300 | 1300 |
Maximum water pressure | barg | 10 | 10 | 10 | 10 | 10 | 10 | 10 | 10 | 10 | 10 | 10 | 10 | 10 | 10 | 10 |
Maximum flow temperature setting | °C | 90 | 90 | 90 | 90 | 90 | 90 | 90 | 90 | 90 | 90 | 90 | 90 | 90 | 90 | 90 |
Units | 97/97H | 97/194V | 97/291V | 116/116H | 116/232V | 116/348V | 147/147H | 147/294V | 147/441V | 196/196H | 196/392V | 196/588V | 254/254H | 254/508V | 254/762V | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Gas flow rate, NG (G20) - maximum | m3/hr | 10.4 | 20.8 | 31.2 | 12.7 | 25.4 | 38.1 | 15.5 | 31 | 46.5 | 20.9 | 41.8 | 62.7 | 26.2 | 52.4 | 78.6 |
Gas flow rate, LPG (G31) - maximum | m3/hr | 4 | 8 | 12 | 5 | 10 | 15 | 6 | 12 | 18 | 8.1 | 16.2 | 24.3 | 10.1 | 20.2 | 30.3 |
Nominal inlet pressure, NG (LPG) - maximum | mbar | 20 (37) | 20 (37) | 20 (37) | 20 (37) | 20 (37) | 20 (37) | 20 (37) | 20 (37) | 20 (37) | 20 (37) | 20 (37) | 20 (37) | 20 (37) | 20 (37) | 20 (37) |
Maximum gas inlet pressure NG (LPG) | mbar | 25 (45) | 25 (45) | 25 (45) | 25 (45) | 25 (45) | 25 (45) | 25 (45) | 25 (45) | 25 (45) | 25 (45) | 25 (45) | 25 (45) | 25 (45) | 25 (45) | 25 (45) |
Units | 97/97H | 97/194V | 97/291V | 116/116H | 116/232V | 116/348V | 147/147H | 147/294V | 147/441V | 196/196H | 196/392V | 196/588V | 254/254H | 254/508V | 254/762V | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Approx. flue gas volume @ 15°C, 8.75-9.25% CO2 | m³/hr | 143 | 286 | 429 | 160 | 320 | 480 | 214 | 428 | 642 | 279 | 558 | 837 | 354 | 708 | 1062 |
Maximum flue gas temperature @ 80/60°C | °C | 83 | 83 | 83 | 83 | 83 | 83 | 78 | 78 | 78 | 83 | 83 | 83 | 82 | 82 | 82 |
Pressure at boiler flue connection | Pa mbar | 150 1.5 | 150 1.5 | 150 1.5 | 150 1.5 | 150 1.5 | 150 1.5 | 150 1.5 | 150 1.5 | 150 1.5 | 150 1.5 | 150 1.5 | 150 1.5 | 150 1.5 | 150 1.5 | 150 1.5 |
NOx emission (0% excess oxygen, dry air free) - NG | mg/kWh | 39.8 | 39.8 | 39.8 | 34.3 | 34.3 | 34.3 | 37.7 | 37.7 | 37.7 | 39.9 | 39.9 | 39.9 | 38.8 | 38.8 | 38.8 |
NOx emission (0% excess oxygen, dry air free) - LPG | mg/kWh | 42 | 42 | 42 | 57.3 | 57.3 | 57.3 | 69.3 | 69.3 | 69.3 | 68.6 | 68.6 | 68.6 | 39.9 | 39.9 | 39.9 |
Units | 97/97H | 97/194V | 97/291V | 116/116H | 116/232V | 116/348V | 147/147H | 147/294V | 147/441V | 196/196H | 196/392V | 196/588V | 254/254H | 254/508V | 254/762V | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Water flow/return connections | inches | G1½" male | G1½" male | G1½" male | G1½" male | G1½" male | G1½" male | G2½" male | G2½" male | G2½" male | G2½" male | G2½" male | G2½" male | G2½" male | G2½" male | G2½" male |
Gas inlet connection pipe thread size | inches | R1" male | R1" male | R1" male | R1" male | R1" male | R1" male | R1¼" male | R1¼" male | R1¼" male | R1¼" male | R1¼" male | R1¼" male | R1¼" male | R1¼" male | R1¼" male |
Nominal flue diameter (I/D) | mm | 100 | 180 | 180 | 100 | 180 | 180 | 150 | 250 | 250 | 150 | 250 | 250 | 150 | 250 | 250 |
Condensate trap connection(s) (O/D) | mm | 32 | 32 | 32 | 32 | 32 | 32 | 32 | 32 | 32 | 32 | 32 | 32 | 32 | 32 | 32 |
Units | 97/97H | 97/194V | 97/291V | 116/116H | 116/232V | 116/348V | 147/147H | 147/294V | 147/441V | 196/196H | 196/392V | 196/588V | 254/254H | 254/508V | 254/762V | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Electrical supply | 230 V 1 Ph 50 Hz | 230 V 1 Ph 50 Hz | 230 V 1 Ph 50 Hz | 230 V 1 Ph 50 Hz | 230 V 1 Ph 50 Hz | 230 V 1 Ph 50 Hz | 230 V 1 Ph 50 Hz | 230 V 1 Ph 50 Hz | 230 V 1 Ph 50 Hz | 230 V 1 Ph 50 Hz | 230 V 1 Ph 50 Hz | 230 V 1 Ph 50 Hz | 230 V 1 Ph 50 Hz | 230 V 1 Ph 50 Hz | 230 V 1 Ph 50 Hz | |
Power consumption - maximum boiler modulation | W | 166 | 332 | 498 | 166 | 332 | 498 | 240 | 480 | 720 | 240 | 480 | 720 | 240 | 480 | 720 |
Start current (per module) | Amp | 1.2 | 1.2 | 1.2 | 1.2 | 1.2 | 1.2 | 1.3 | 1.3 | 1.3 | 1.3 | 1.3 | 1.3 | 1.3 | 1.3 | 1.3 |
Run current (per module) | Amp | 0.72 | 0.72 | 0.72 | 0.72 | 0.72 | 0.72 | 1.05 | 1.05 | 1.05 | 1.05 | 1.05 | 1.05 | 1.05 | 1.05 | 1.05 |
Approx shipping weight | kg | 180 | 355 | 540 | 180 | 355 | 540 | 226 | 452 | 678 | 226 | 452 | 678 | 226 | 452 | 678 |
Noise emission @1m @maximum modulation | Max dB (A) | 60 | 60 | 60 | 60 | 60 | 60 | 65 | 65 | 65 | 65 | 65 | 65 | 65 | 65 | 65 |
Noise emission @1m @minimum modulation | Min dB (A) | 47 | 47 | 47 | 47 | 47 | 47 | 47 | 47 | 47 | 47 | 47 | 47 | 47 | 47 | 47 |
Need help with your appliance? Download our guides for more technical information on your appliance.
Modumax mk4 is the latest evolution of Hamworthy's floor-standing modular boiler. It keeps the established performance, reliability and modular capability of mk3 while introducing practical improvements to installation, usability and connectivity.
Modumax mk4 is the latest evolution of Hamworthy's floor-standing modular boiler. It keeps the established performance, reliability and modular capability of mk3 while introducing practical improvements to installation, usability and connectivity.
It can support both new modular boiler projects and refurbishment/replacement projects. For new projects, the proposition centres on compact high output, modular flexibility, load matching and resilience. For existing Modumax installations, the same footprint and connection positions help make refurbishment straightforward.
No. Modumax mk4 is the next evolution of the Modumax platform and is suitable for new modular projects as well as refurbishment. Where an existing mk3 is being replaced, the same footprint, connection positions, outputs and controls help minimise redesign and rework.
The main changes are a 7-inch touchscreen HMI, a new HMI status bar, reduced flue height on two- and three-stack boilers, a Modbus connectivity kit, VFC remote signalling supplied as standard, updated styling and an LPG conversion option.
Modumax mk4 carries forward the core Modumax proposition, including modular design, outputs and performance, familiar controls, footprint and connection positions. It is also available at the same list price as mk3.
No. Modumax mk4 has the same outputs, efficiency and core performance as mk3.
Yes. Modumax mk4 has the same footprint and connection positions as mk3, helping make replacement within an existing Modumax plantroom straightforward.
For an mk3 replacement, having the same connection positions will minimise changes to existing pipework and avoid unnecessary redesign. Project-specific requirements should always be checked against the approved technical documentation.
On two- and three-stack boilers, the flue height is approximately 240mm lower. This provides greater flexibility where plantroom or ceiling height is restricted.
Modumax mk4 is simpler to install, particularly for refurbishment projects and where reduced flue height is beneficial. The exact installation time will depend on the individual project, so avoid quoting a fixed time saving.
No. Modumax mk4 is available at the same list price as mk3. Any project-specific accessories, conversion kits or installation requirements should be considered separately.
The 7-inch touchscreen HMI provides faster, more intuitive navigation between screens, clearer fault visibility and easier system configuration.
No. The controls, parameters and options remain familiar to mk3 users, helping keep the learning curve minimal.
The new status bar provides clear visual indication of boiler status, helping make normal operation, standby and fault conditions easier to identify.
A Modbus gateway kit allows the boiler or boilers to connect to a Modbus-enabled Building Management System or controller for monitoring and control.
VFC remote signalling provides remote indication of normal operation and fault conditions. It is supplied as standard on mk4.
Yes. Modumax mk4 is dual-approved for Natural Gas and LPG.
Where LPG is required, a dedicated conversion kit enables on-site conversion without the need for a separate LPG-specific boiler variant.
Existing Modumax pipe kit options remain available, including DN100, DN150 and DN200 options across two- and three-stack configurations. Six additional kits are also available with matched primary pumps.
Modumax mk4 delivers outputs of up to 762kW from less than 1m², 5:1 turndown per module, up to 40°C ΔT, a 90°C maximum flow temperature, a stainless steel heat exchanger and a 10-year heat exchanger warranty.
Yes. Modumax mk4 has been designed and built in Hull, with the UK market in mind.
The current internal FAQ states that mk3 spare parts are planned to remain available until 2036.
Refer to the Modumax mk4 product brochure, technical sheets and schematics. For project-specific questions, contact Darren Townend, Commercial Product Manager.






